行业垂直门户网站

设为首页 | 加入收藏

您当前的位置:北极星智能电网在线 > 技术文章 > 正文

大规模风电接入的继电保护问题综述(3)

参考文献

[1] Smith J C,Milligan M R,DeMeo E A,et al.Utility wind integrationand operating impact state of the art[J].IEEE Trans on PowerSystems,2007,22(3):900-908.

[2] Morren J,de Haan S W H. Short-circuit current of wind turbineswith doubly fed induction generator[J].IEEE Transactions on EnergyConversion,2007,22(1):174-180.

[3] Sulla F,Svensson J, Samuelsson O.Symmetrical and unsymmetricalshort-circuit current of sauirrel-cage and doubly-fed inductiongenerators[J].Electric Power Systems Research,2011,81(8):1610-1618.

[4] Samaan N, Zavadil R,Smith J C,et al.Modeling of wind powerplants for short circuit analysis in the transmission network[C]//IEEE/PES Transmission and Distribution Conference andExposition.Chicago,IL:IEEE,2008:1-7.

[5] Ouhrouche M.Transient analysis of a grid connected wind driveninduction generator using a real-time simulation platform[J].Renewable Energy,2009,34(3):801-806.

[6] 石一辉,鲁宗相,闵勇,等.双馈感应发电机三相短路电流解析计算模型[J].电力系统自动化,2011,35(8):38-43.Shi Yihui,Lu Zongxiang,Min Yong,et al.Practical calculation modelof three-phase short-circuit current for doubly-fed induction generator[J].Automation of Electric Power Systems,2011,35(8):38-43(inChinese).

[7] Vicatos M S,Tegopoulos J A.Transient state analysis of a doubly-fedinduction generator under three phase short circuit[J] . IEEETransactions on Energy Conversion,1991,6(1): 62-68.

[8] Morren J, de Haan S W H.Ride through of wind turbines withdoubly-fed induction generator during a voltage dip[J] . IEEETransactions on Energy Conversion,2005,20(2):435-441.

[9] 杨淑英,张兴,张崇巍,等.电压跌落激起的双馈型风力发电机电磁过渡过程[J].电力系统自动化,2008,32(19):85-91.Yang Shuying,Zhang Xing,Zhang Chongwei,et al.Electro-magnetictransition of doubly fed wind turbines initiated by voltage dip[J].Automation of Electric Power Systems,2008,32(19):85-91(inChinese).

[10] 胡家兵,贺益康,郭晓明,等.不平衡电压下双馈异步风力发电系统的建模与控制[J].电力系统自动化,2007,31(14):47-56.Hu Jiabing,He Yikang,Guo Xiaoming,et al.Modeling and controlof the DFIG based wind-power generation system under unbalancedgrid voltage conditions[J].Automation of Electric Power Systems,2007,31(14):47-56(in Chinese).

[11] 徐殿国,王伟,陈宁.基于撬棒保护的双馈电机风电场低电压穿越动态特性分析[J].中国电机工程学报,2010,30(22):29-36.Xu Dianguo,Wang Wei,Chen Ning.Dynamic characteristic analysisof doubly-fed induction generator low voltage ride-through based oncrowbar protection[J].Proceedings of the CSEE,2010,30(22):29-36(in Chinese).

[12] Kawady T A.An interactive simulation of grid-connected DFIG unitsfor protective relaying studies[C]//Proceeding of 1st IEEE-PES/IASConference on Sustainable alternative Energy,SAE.Valencia:IEEE,2009:1-8.

[13] 邢文琦,晁琴.含不同风电机组的风电电网仿真研究[J].电网技术,2009,33(7):99-102.Xing Wenqi,Chao Qin.Simulation study on wind power systemcontaining various wind turbine generators[J] . Power SystemTechnology,2009,33(7):99-102(in Chinese).

[14] 关宏亮,赵海翔,刘燕华,等.风力发电机组对称短路特性分析[J].电力自动化设备,2008,28(1):61-64.Guan Hongliang,Zhao Haixiang,Liu Yanhua,et al.Symmetrical shortcircuit analysis of wind turbine generator[J] . Electric PowerAutomation Equipment,2008,28(1):61-64(in Chinese).

[15] Kawady T,Feltes C,Erlich I,et al.Protection system behavior ofDFIG based wind farms for grid-faults with practical considerations[C]//IEEE Power and Energy Society General Meeting.2010:1-6.

[16] Mahadanaarachchi V P,Ramakumar R.Simulation of faults inDFIG-based wind farms[C]//IEEE Power and Energy Society GeneralMeeting.Calgary,AB:IEEE,2009:1-8.

[17] Morren J,Pierik J T G,de Haan S W H.Voltage dip ride-through ofdirect-drive wind turbines[C]//Proceedings of 39th InternationalUniversities Power Engineering Conference.Bristol:University of theWest of England,Pow. Syst. and Res. Group,2004:934-938.

[18] 赵紫龙,吴维宁,王伟.电网不对称故障下直驱风电机组低电压穿越技术[J].电力系统自动化,2009,33(21):87-91.Zhao Zilong,Wu Weining,Wang Wei.A low voltage ride throughtechnology for direct-drive wind turbines under unbalanced voltagedips[J].Automation of Electric Power Systems,2009,33(21):87-91(in Chinese).

[19] 胡书举,李建林,许洪华.永磁直驱风电系统低电压运行特性的分析[J].电力系统自动化,2007,31(17):73-77.Hu Shuju,Li Jianlin,Xu Honghua.Analysis on the low-voltage-ridethroughcapability of direct-drive permanent magnetic generator windturbines[J].Automation of Electric Power systems,2007,31(17):73-77(in Chinese).

[20] 杨晓萍,段先锋,钟彦儒.直驱永磁同步风电机组不对称故障穿越的研究[J].电机与控制学报,2010,14(2):7-12.Yang Xiaoping,Duan Xianfeng,Zhong Yanru.Asymmetrical faultsride-through of directly driven wind turbine with permanent magnetsynchronous generator[J].Electric Machines and Control,2010,14(2):7-12(in Chinese).

[21] 姚俊,廖勇,庄凯.电网故障时永磁直驱风电机组的低电压穿越控制策略[J].电力系统自动化,2009,33(12):91-96.Yao Jun,Liao Yong,Zhuang Kai.A low voltage ride-through controlstrategy of permanent magnet direct-driven wind turbine under gridfaults[J].Automation of Electric Power Systems,2009,33(12):91-96(in Chinese).

[22] 蔺红,晁勤.电网故障下直驱式风电机组建模与控制仿真研究[J].电力系统保护与控制,2010,38(21):189-195.Lin Hong,Chao Qin.Simulation study of modelling and control ofdirect drive wind turbine under grid fault[J].Power System Protectionand Control,2010,38(21):189-195(in Chinese).

[23] 文玉玲,晁勤,吐尔逊﹒伊布拉音.风电场对电网继电保护的影响[J].电网技术,2008,32(14):15-18.Wen Yuling,Chao Qin,Tuerxun Yibulayin.Impact of interconnectedwind farm on power system protection[J].Power System Technology,2008,32(14):15-18(in Chinese).

[24] 文玉玲.风电场短路特性及对电网继电保护影响的研究[D].乌鲁木齐:新疆大学,2009.

[25] 李凤婷,晁勤.风速变化的并网型风电场故障分析[J].北京交通大学学报,2007,31(5):105-109.Li Fengting,Chao Qin.Fault analysis of wind farm connected topower system in varied wind[J] . Journal of Beijing JiaotongUniversity,2007,31(5):105-109(in Chinese).

[26] Wang J,Zhang B H,Hao Z G,et al.Fault features of centrallyintegrated wind farm[C]//Proceedings of 10th InternationalConference on Environment and Electrical Engineering(EEEIC).Rome:IEEE,2011:8-11.

[27] 苏常胜,李凤婷,晁勤,等.异步风力发电机等值及其短路特性研究[J].电网技术,2011,35(3):177-182.Su Changsheng,Li Fengting,Chao Qin,et al.Research on equivalentaggregation of asynchronous wind power generators and itsshort-circuit characteristics[J].Power System Technology,2011,35(3):177-182(in Chinese).

[28] 朱玲玲,李长凯,张华中,等.含分布式电源的配电网方向过流保护[J].电网技术,2009,33(14):94-98.Zhu Lingling,Li Changkai,Zhang Huazhong,et al.Directionalovercurrent protection for distribution systems containing distributedgeneration[J].Power System Technology,2009,33(14):94-98(inChinese).

[29] 杨国生,李欣,周泽昕.风电场接入对配电网继电保护的影响与对策[J].电网技术,2009,33(11):87-91.Yang Guosheng,Li Xin,Zhou Zexin.Impacts of wind farm on relayprotection for distribution network and its countermeasures[J].PowerSystem Technology,2009,33(11):87-91(in Chinese).

[30] Comech M P,Montanes M A,Garcia M G.Overcurrent protectionbehavior before wind farm contribution[C]//The 14th IEEEMediterranean Electrotechnical Conference,MELECON.Ajaccio:IEEE,2008:762-767.

[31] Jang S I,Choi J H, Kim J W,et al.An adaptive relaying for theprotection of a wind farm interconnected with distributionnetworks[C]//Proceedings of the IEEE Power Engineering SocietyTransmission and Distribution Conference.Dallas,TX:IEEE,2003:296-302.

[32] 文玉玲,晁勤,吐尔逊.伊布拉音.关于风电场适应性继电保护的探讨[J].电力系统保护与控制,2009,37(5):47-51.Wen Yuling,Chao Qin,Tuerxun Yibulayin.Study on adaptiveprotection of wind farm[J].Power System Protection and Control,2009,37(5):47-51(in Chinese).

[33] 庞建业,夏晓宾,房牧.分布式发电对配电网继电保护的影响[J].继电器,2007,35(11):5-8.Pang Jianye,Xia Xiaobin,Fang Mu.Impact of distributed generationto relay protection of distribution system[J].Relay,2007,35(11):5-8(in Chinese).

[34] 崔运海,王建勋.风电场接入系统继电保护配置方案研究[J].吉林电力,2009,37(4):1-4.Cui Yunhai,Wang Jianxun.Research on relay protection configurationof wind farm connecting into power system[J].Jilin Electric Power,2009,37(4):1-4(in Chinese).

[35] 梁玉枝,崔树平,王冬梅.对风电场接入电网后系统继电保护配置的探讨[J].华北电力技术,2009(9):1-4.Liang Yuzhi , Cui Shuping , Wang Dongmei . Discussion ofconfiguration for relay protection after wind farm integration intopower system[J].North China Electric Power,2009(9):1-4(inChinese).

[36] 李生虎,贾树森,孙莎莎.风电系统距离III 段保护动作特性分析[J].电力系统自动化,2011,35(5):31-35.Li Shenghu,Jia Shusen,Sun Shasha.Operation characteristicsanalysis of Zone 3 distance protection in wind powersystems[J].Automation of Electric Power Systems,2011,35(5):31-35(in Chinese).

[37] 何世恩,索南加乐,杨铖,等.适应于酒泉风电送出的 750kV 线路纵联保护原理研究[J].电力系统保护与控制,2010,38(16):87-91.He Shien,Suonan Jiale,Yang Cheng,et al.A 750 kV transmissionline pilot protection suitable to Jiuquan wind power base delivery[J].Power System Protection and Control,2010,38(16):87-91(inChinese).

[38] Pradhan A K,Joos G.Adaptive distance relay setting for linesconnecting wind farms[J].IEEE Transactions on Energy Conversion,2007,22(1):206-213.

来源:《电网技术》
北极星投稿热线:陈女士 13693626116 邮箱:chenchen#bjxmail.com(请将#换成@)
最新新闻

新闻排行榜

今日

本周

本月

相关专题